| Client: | DOUBLETREE CHEVIOT HOLDINGS, LLC | ||
| Proj Mgr: | Not Assigned | Completed: | On-Going |
| Industry: | Drycleaners |
Service: | Phase 2 Subsurface Investigations Soil Remediation Litigation Support Regulatory Response & Negotiation Health Risk Assessments Groundwater Remediation |
| The goal of this current project is to expeditiously obtain a "No Further Action Letter" after the PCE impacted soils and groundwater are adequately addressed. | |||
| Client: | CHRISTEL SHEARER | ||
| Proj Mgr: | Daniel Nunez |
Completed: | 5/31/2008 |
| Industry: | Business Owners Gas Station/ Underground Storage Tank Owners |
Service: | Groundwater Remediation Operations And Maintenance Of Remediation Systems |
| This case involved the removal of underground storage tanks, site assessment with the installation of 18 on and off-site groundwater monitoring wells, three dual nested soil vapor extraction wells and three air sparge wells. | |||
| Client: | LAW OFFICE OF STAN RALLS | ||
| Proj Mgr: | Not Assigned | Completed: | On-Going |
| Industry: | Attorneys Manufacturers Brownfield Industry Stakeholders |
Service: | Soil Remediation Regulatory Response & Negotiation Health Risk Assessments Groundwater Monitoring Site Assessment Groundwater Remediation |
| This Site contained a bowling alley, a former dry cleaner, and a former gasoline station that had been laying fallow and unused for nearly three decades. The Reynolds Group, the fourth consultant on this project, was able to finally move the project forward and assist a financial transaction that generated cash for the seller and a new asset for the buyer that will be redeveloped into a new retail center in a core area of the City of Long Beach. | |||
| Client: | MR. AUTO | ||
| Proj Mgr: | Daniel Nunez |
Completed: | On-Going |
| Industry: | Service: | Ca Soil Remediation Regulatory Response & Negotiation Groundwater Monitoring Site Assessment Groundwater Remediation Operations And Maintenance Of Remediation Systems |
|
| In 1989, two 2,000 gallon gasoline, one 8,000 gallon gasoline, and one 250 gallon waste oil underground storage tanks (USTs) were removed. | |||
| Client: | ARCO POWER GAS | ||
| Proj Mgr: | Daniel Nunez |
Completed: | On-Going |
| Industry: | Service: | Ca Soil Remediation Litigation Support Health Risk Assessments Groundwater Monitoring Site Assessment Groundwater Remediation Operations And Maintenance Of Remediation Systems Construction -- General Engineering/building/haz |
|
| TRG worked with legal counsel to resolve the litigation between the property owners, providing remedial options analysis, cost estimates and technical expert support, which resulted in a court-approved settlement. In 1998, five underground storage tanks were removed, including one 12,000-gallon diesel UST, two 10,000-gallon USTs, and two 5,000-gallon USTs. Fifteen groundwater monitoring wells have been installed to assess the groundwater plume on and off the property. | |||